New section of Hong Kong’s Central Kowloon Bypass undergoing final checks

by | Dec 14, 2025 | Asia

Spread the love
Hong Kong’s much-awaited Yau Ma Tei section of the Central Kowloon Bypass is undergoing final testing before its debut on December 21, authorities have said, adding that a core challenge has been tunnelling beneath 240 structures in the area.
The new 4.7km (7.56-mile) transport corridor in Kowloon, which includes a 3.9km three-lane, two-way tunnel linking the Kai Tak Development Area and Kowloon Bay with Yau Ma Tei, is set to slash the peak-hour journey time from about 30 minutes to five.
“We…

Written By

Written by Albert Pham, News Curator and Blogger

Related Posts

0 Comments